SAP C_TSCM42_67 is a professional-level certification course that is designed for individuals who want to achieve knowledge and skillset that are required to work with the SAP Solution Manager Production Planning. This certification course covers the essential concepts, functionality, and configuration of SAP Production Planning. Candidates who clear this certification exam will be able to demonstrate their knowledge and understanding of SAP Production Planning.

 

NO.40 For which of the following objects can you enter a confirmation? (Choose two)

 
 
 
 

NO.41 When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

 
 
 
 

NO.42 Which of the following statements about the planning functions available in SAP ECC is correct?

 
 
 
 

NO.43 A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?

 
 
 
 

NO.44 What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)

 
 
 
 
 

NO.45 Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?

 
 
 
 

NO.46 Which option for selecting a routing exists when you create a production order?

 
 
 
 

NO.47 What could be a consequence of the confirmation of an operation?

 
 
 
 

NO.48 Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?

 
 
 
 

NO.49 In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)

 
 
 
 
 

NO.50 The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)

 
 
 
 

NO.51 Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)

 
 
 
 
 

NO.52 What do you have to consider regarding consumption? (Choose two)

 
 
 
 

NO.53 Where can you define the valid receivers for production order costs?

 
 
 
 

NO.54 Which of the following requirements is supported by using process orders?

 
 
 
 

Dumps Brief Outline Of The C_TSCM42_67 Exam: https://www.examcollectionpass.com/SAP/C_TSCM42_67-practice-exam-dumps.html

Post date: 2023-04-30 10:17:45
Post date GMT: 2023-04-30 10:17:45
Post modified date: 2023-04-30 10:17:45
Post modified date GMT: 2023-04-30 10:17:45